The Repair Schedule tab lets you add and modify the schedules of asset repair. A repair is scheduled when it is a routine service performed on assets to maintain and enhance the asset's working condition. A repair is non-scheduled when it is a damage caused to an asset due to reasons such as accident, vandalism, break-down, and natural disaster.
From the Repair Schedule tab, you can do the following:
Tip
To view the Repair Schedule tab, click the Repair Schedule link.
The Add New Repair Schedule dialog box lets you add a new schedule for repairs.
Tip
To view the Add New Repair Schedule dialog box, click the Add New Repair Schedule link.
1. Open the Repair Codes page.
2. Click the Repair Schedule tab, and then click Add New Repair Schedule.
The Add New Repair Schedule dialog box opens.
3. In the Schedule box, type a name for the repair schedule.
4. When finished, click one of the following
§ Save to save the information and close the dialog box.
§ Save & New to save the information and add another record.
§ Cancel to disregard any changes and close the dialog box.
The Edit Repair Schedule dialog box lets you modify the existing schedule name.
Tip
To view the Edit Repair Schedule dialog box, click the Edit Repair Schedule link.
1. Open the Repair Codes page.
2. Click the Repair Schedule tab.
3. Click Edit next to a repair schedule that you want to edit.
The Edit Repair Schedule dialog box opens.
4. Change the schedule name if required.
5. When finished, do one of the following:
§ Save to save the information and close the dialog box.
§ Cancel to disregard any changes and close the dialog box.
§ Click Make Value Obsolete to temporarily hide the schedule from the Default Schedule list.
§ Click Delete to permanently delete the schedule from FASTER Web.