You can add the work order details in the Create Asset Work Order Document dialog box.
Tip
To view the Create Asset Work Order Document dialog box, click the Create Asset Work Order Document link.
1. Open the Create Asset Work Order Document dialog box.
2. The Maintenance Shop list displays the maintenance shops that are assigned to the user, select the required maintenance shop from the list.
Note:
|
3. The Status list displays the current status of the work order which is Active by default. Optionally, select a different status.
4. Optionally, select the Disable Downtime Tracking check box if you do not want to calculate the asset downtime.
You can not edit the Disable Downtime Tracking check box after creating the work order.
Note: While creating work order for a maintenance shop, the Approved Above Threshold check box is available only when:
To override the total cost of work order above the specified threshold amount, the user roles with Can Authorize Spending permission can select the Approved Above Threshold check box and save the work order details. For others, an Authorization dialog box opens to login with the user credentials having Can Authorize Spending permission. On successful authorization, the work order details are saved. Also, the authorization of work order total cost above the specified threshold amount is required only once.
|
5. In the Reading column of the Meter Information section, type the current meter reading.
Note: The Meter Information section displays the meter types that are added to the asset and their actual meter readings.
|
6. The Department list displays the department assigned to the asset. Optionally, select a different department.
7. The Date/Time In field displays the current date and time. Optionally, type the date and time in the MM/DD/YYYY HH:MM:SS AM/PM format, or select the date from the calendar and time from the clock.
8. The Bill Code list displays the billing type assigned to the asset. Optionally, select a different bill code.
9. Optionally, in the Date/Time Promised field, type or select the estimated date and time to complete the maintenance activity.
10. Optionally, in the Contact list, select the contact person associated with the asset for any asset related query.
11. Optionally, in the Priority list, select the level of priority to complete the work order.
12. Optionally, in the Symptom box, type the reason for the asset maintenance.
13. Click one of the following:
o Save to save the information and close the dialog box.
o Cancel to disregard any changes and close the dialog box.